top of page

Status:               Bidding as a Sub for Concrete Work

​

 

The work to be done, in general, consists of mobilization, traffic control, storm water pollution control, street pavement rehabilitation, pavement milling, cold-in-place recycling, placement of hot mix asphalt concrete, ADA ramp construction, traffic striping and markings, installation of video detection cameras, adjustment and relocation of pedestrian push buttons and all other work as shown on the Plans and as specified in these Special Provisions.

Description:

 

Bid Date Information

1/09/19

2:00 PM

Bid Date

Bid Time

©2017 by Sposeto Engineering Inc.

bottom of page