top of page

Status:               Bidding as Sub-Contractor for Concrete Work

 

 

PCC sidewalk, driveway, curb and gutter removal and replacement; tree trimming; root pruning; ADA compliant accessibility ramp and passageway installation; traffic signal modification; removal and replacement of traffic striping, markers, and pavement marking; lowering of existing utilities and other appurtenances; asphalt concrete milling; asphalt concrete digouts; stress absorbing membrane interlayer (SAMI)/rubber chip seal application; rubberized asphalt concrete street resurfacing; adjustment of utility.

Description:

 

Bid Date Information

1/08/2019

3:00 PM

Bid Date

Bid Time

bottom of page