Status:               Bidding as Prime

Subcontractor Needed:

 

    SWPP, Survey, Trucking, Striping & Signs, Traffic Control, Electrical, AC Grinding, Landscape & Irrigation

 

 

 

Documents

 

The work consists of removal of concrete and asphalt paving; excavation; concrete curbs and
paving; asphalt grinding and paving; planting and irrigation; rectangular rapid flashing
beacon; signing and striping and temporary traffic control located on Linden Avenue at
Miller, Juniper and California Avenues and on Spruce Avenue at Lux, Park and Maples
Avenues in South San Francisco, CA.

Description:

 

7/16/2020

2:00 PM

Bid Date

Bid Time

Bid Date Information

©2017 by Sposeto Engineering Inc.