top of page

Status:               Bidding as Prime

​

Subcontractor Needed:

 

    SWPP, Trucking, Survey, Striping and Signage, Electrical, Landscape

 

 

Documents

 

Project consists of providing traffic control and construction area signs; providing and implementing water pollution control plan; upgrading the existing sidewalk, curb, gutter, pedestrian ramps, and street lights; and installing bulb-outs, bio retention areas, Class II buffered bike lane, and high-visibility crosswalk markings at the intersection of Villareal Drive and Greenville Place in Castro Valley.

Description:

 

Bid Date Information

10/06/2020

02:00 PM

Bid Date

Bid Time

bottom of page